Located in the Heart of Historic Sandpoint, Idaho on Church Street this 4 story, 48-unit complex contains retail space on the main floor and studio and 1-bedroom apartments.
Located next to our other Sandpoint project this 4-story building has a large donut and coffee shop and 40 studio and 1-bedroom apartments.
Located in the historic Mercardo District close to the Congress Streetcar Station this 3-story 77-unit apartment complex consists of Studio, 1-Bedroom and 2 Bedroom Apartments.
Located in the historic Mercardo District close to the Congress Streetcar Station this 4-story 66-unit apartment complex consists of Studio and 1-Bedroom apartments.
Located at the corner of Country Club and Main Street in Mesa, Arizona feet from the Country Club Light rail station this 5-Story building consists of 156 Studio, 1-Bedroom and 2 Bedroom Apartments.
Located on Main Street in Mesa, Arizona feet from the Country Club Light rail station this 6-Story building consists of 265 Studio, 1-Bedroom and 2 Bedroom Apartments.
Located in Downtown Phoenix, Greenprint on 3rd consists of 77 studio and 1-bedroom apartments.
A mix of 116 studio and 1-bedroom apartments, located in a rapidly growing Opportunity Zone near Hill Air Force Base. Completed Winter 2023.
At the former site of the John B. Kelly house, we built a 7 story building with 115 units. Completed Summer 2023.
Located near the Old Greek Town TRAX station, with a mix of 150 studios and 1-bedroom units. Completed Winter 2022.
GREENPRINT North Temple is located near the Jackson/Euclid TRAX station and has 113 units. Completed Spring 2022.
Located in SLC's historic Fairpark district, this project has 150 apartments with a varied mix of unit sizes. Construction was completed Summer 2021.
Two buildings with 68 units, GREENPRINT 9th Station is in the happening Granary District, near the Trax 9th station stop. Construction was completed in May 2021.
Three buildings and 145 total micro units, conveniently located near a TRAX station. GREENPRINT West Temple was completed in April 2020.
The first apartment building in Utah that contained only micro studios, GREENPRINT @ the Trax was completed in 2017. It has 60 units..
Located in the Heart of Salt Lake City on North Temple this 8-story building has 177 units consisting of Studio, 1 Bedroom and 2 Bedroom apartments. Completed in the February of 2025
64 Studio Units located on North Temple in Salt Lake City near the Jackson/Euclid TRAX station Completed in the December of 2024
58 studio and 1-bedroom units, across from the Utah State Fairgrounds in Salt Lake City. Completed in the Summer of 2024